Your search:
720 result(s) in 0.16 s
-
DUKAS_189788644_NUR
Flood And Landslide Continue To Disrupt Nepal's Highways Following Last Week Downpour
Construction vehicles work to set up a road diversion to let vehicles pass through a section of a major highway in Kavrepalanchowk district, Nepal, on October 9, 2025, following the rain-induced disaster of the previous week. The three days of continuous rainfall that batter the nation trigger landslides and flooding, damaging over half a dozen highways. (Photo by Sanjit Pariyar/NurPhoto) -
DUKAS_189788642_NUR
Flood And Landslide Continue To Disrupt Nepal's Highways Following Last Week Downpour
Construction vehicles work to set up a road diversion to let vehicles pass through a section of a major highway in Kavrepalanchowk district, Nepal, on October 9, 2025, following the rain-induced disaster of the previous week. The three days of continuous rainfall that batter the nation trigger landslides and flooding, damaging over half a dozen highways. (Photo by Sanjit Pariyar/NurPhoto) -
DUKAS_189788636_NUR
Flood And Landslide Continue To Disrupt Nepal's Highways Following Last Week Downpour
Construction vehicles work to set up a road diversion to let vehicles pass through a section of a major highway in Kavrepalanchowk district, Nepal, on October 9, 2025, following the rain-induced disaster of the previous week. The three days of continuous rainfall that batter the nation trigger landslides and flooding, damaging over half a dozen highways. (Photo by Sanjit Pariyar/NurPhoto) -
DUKAS_189788632_NUR
Flood And Landslide Continue To Disrupt Nepal's Highways Following Last Week Downpour
Construction vehicles work to set up a road diversion to let vehicles pass through a section of a major highway in Kavrepalanchowk district, Nepal, on October 9, 2025, following the rain-induced disaster of the previous week. The three days of continuous rainfall that batter the nation trigger landslides and flooding, damaging over half a dozen highways. (Photo by Sanjit Pariyar/NurPhoto) -
DUKAS_189788640_NUR
Flood And Landslide Continue To Disrupt Nepal's Highways Following Last Week Downpour
Construction vehicles work to set up a road diversion to let vehicles pass through a section of a major highway in Kavrepalanchowk district, Nepal, on October 9, 2025, following the rain-induced disaster of the previous week. The three days of continuous rainfall that batter the nation trigger landslides and flooding, damaging over half a dozen highways. (Photo by Sanjit Pariyar/NurPhoto) -
DUKAS_189164453_NUR
Perilous Condition Of Highways In Nepal
Vehicles pass through the damaged Dhulikhel-Khawa section of the Araniko Highway that runs through Kavrepalanchowk District of Nepal on September 23, 2025. The construction of the Dhulikhel-Khawa road section under the Araniko Highway remains uncertain. The road construction project comes to a standstill after the contract with the construction company is terminated due to failure to complete the work within the stipulated and extended deadlines. A contract agreement is signed between the Road Division Office, Bhaktapur, and Gauri Parbati Nirman Sewa Pvt. Ltd on June 3, 2022, for the expansion of the 4.155-kilometre Dhulikhel-Khawa road section, with a deadline of 22 months, which expires on April 1, 2024. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_189164428_NUR
Perilous Condition Of Highways In Nepal
Vehicles pass through the damaged Dhulikhel-Khawa section of the Araniko Highway that runs through Kavrepalanchowk District of Nepal on September 23, 2025. The construction of the Dhulikhel-Khawa road section under the Araniko Highway remains uncertain. The road construction project comes to a standstill after the contract with the construction company is terminated due to failure to complete the work within the stipulated and extended deadlines. A contract agreement is signed between the Road Division Office, Bhaktapur, and Gauri Parbati Nirman Sewa Pvt. Ltd on June 3, 2022, for the expansion of the 4.155-kilometre Dhulikhel-Khawa road section, with a deadline of 22 months, which expires on April 1, 2024. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_189164426_NUR
Perilous Condition Of Highways In Nepal
Vehicles pass through the damaged Dhulikhel-Khawa section of the Araniko Highway that runs through Kavrepalanchowk District of Nepal on September 23, 2025. The construction of the Dhulikhel-Khawa road section under the Araniko Highway remains uncertain. The road construction project comes to a standstill after the contract with the construction company is terminated due to failure to complete the work within the stipulated and extended deadlines. A contract agreement is signed between the Road Division Office, Bhaktapur, and Gauri Parbati Nirman Sewa Pvt. Ltd on June 3, 2022, for the expansion of the 4.155-kilometre Dhulikhel-Khawa road section, with a deadline of 22 months, which expires on April 1, 2024. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_189164425_NUR
Perilous Condition Of Highways In Nepal
Vehicles pass through the damaged Dhulikhel-Khawa section of the Araniko Highway that runs through Kavrepalanchowk District of Nepal on September 23, 2025. The construction of the Dhulikhel-Khawa road section under the Araniko Highway remains uncertain. The road construction project comes to a standstill after the contract with the construction company is terminated due to failure to complete the work within the stipulated and extended deadlines. A contract agreement is signed between the Road Division Office, Bhaktapur, and Gauri Parbati Nirman Sewa Pvt. Ltd on June 3, 2022, for the expansion of the 4.155-kilometre Dhulikhel-Khawa road section, with a deadline of 22 months, which expires on April 1, 2024. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_189164423_NUR
Perilous Condition Of Highways In Nepal
Vehicles pass through the damaged Dhulikhel-Khawa section of the Araniko Highway that runs through Kavrepalanchowk District of Nepal on September 23, 2025. The construction of the Dhulikhel-Khawa road section under the Araniko Highway remains uncertain. The road construction project comes to a standstill after the contract with the construction company is terminated due to failure to complete the work within the stipulated and extended deadlines. A contract agreement is signed between the Road Division Office, Bhaktapur, and Gauri Parbati Nirman Sewa Pvt. Ltd on June 3, 2022, for the expansion of the 4.155-kilometre Dhulikhel-Khawa road section, with a deadline of 22 months, which expires on April 1, 2024. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_188464705_NUR
Construction Barriers Munich
Road barriers mark a construction site in front of the Ibis Hotel in Munich, Bavaria, Germany, on September 4, 2025. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_186385435_POL
Dubai Travel
March 18, 2025 - Dubai, United Arab Emirates, Asia: Workers walk past a signposted roadworks site. (Olaf Schuelke / Polaris) (FOTO:DUKAS/POLARIS)
Olaf Schuelke -
DUKAS_123909640_RHA
Huge chinese road project in the southwest corner of Cameroon
Huge Chinese road construction project in the southwest corner of Cameroon, Africa
Michael Runkel -
DUKAS_123909639_RHA
Huge chinese road project in the southwest corner of Cameroon
Huge Chinese road construction project in the southwest corner of Cameroon, Africa
Michael Runkel -
RDB00451729
rdb00451729
"Die N1 wächst zusammen"
Letzte Ausgabe mit altem Logo: "Schweizer Illustrierte Zeitung"--- Titelblatt Schweizer Illustrierte Zeitung 36, 1965: Autobahnbau#Cover of the Schweizer Illustrierte Zeitung 36, 1965: Highway Construction- RDB BY DUKAS
RDB -
RDB00398838
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379287
Bellvue Zürich Baustelle 2009
Bellvue Zürich
Hauser Marcel ist heute 60 (wie beni Turnheer...)
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379285
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379284
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379283
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379282
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379281
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379280
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379279
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379278
Bellvue Zürich Baustelle 2009
Bellvue Zürich
Hauser Marcel ist 60 (wie beni Turnheer...)
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00379277
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00358560
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00349912
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00349911
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00349879
Bellvue Zürich Baustelle 2009
Bellvue Zürich
grösste baustelle, Tramgeleise neu
Foto: Sabine Wunderlin- RDB BY DUKAS
RDB -
RDB00325064
FDP Parteipraesident Fulvio Pelli
FOTO: PETER GERBER, 07.08.2008, Courtedoux (JU):
Brueckenbauer wollte FDP Parteipraesident Fulvio Pelli als Kind werden. In Courtedoux durfte Pelli eine Brueckenbauer Baustelle der A16 Autobahnerweiterung besuchen. Pelli in luftiger Hoehe. Im Suva Korb per Kran auf das A16 Viadukt- RDB BY DUKAS
RDB -
RDB00295245
FDP Parteipraesident Fulvio Pelli
FOTO: PETER GERBER, 07.08.2008, Courtedoux (JU):
Brueckenbauer wollte FDP Parteipraesident Fulvio Pelli als Kind werden. In Courtedoux durfte Pelli eine Brueckenbauer Baustelle der A16 Autobahnerweiterung besuchen. Pelli in luftiger Hoehe. Im Suva Korb per Kran auf das A16 Viadukt- RDB BY DUKAS
RDB -
RDB00260268
rdb00260268
--- Baustopp an der Baustelle 'Schmuklerski' in Zürich 2007#Baustopp an der Baustelle 'Schmuklerski' in Zürich 2007- RDB BY DUKAS
RDB -
RDB00213720
Autobahn-Baustelle zwischen Erstfeld und Amsteg, 2006
--- Autobahn-Baustelle zwischen Erstfeld und Amsteg, 2006#Motorway building site between Erstfeld and Amsteg, 2006- RDB BY DUKAS
RDB -
RDB00018040
T. Linder, Arbeiter an der "Chrampf-Olympiade" 1969
Ein Stück Strassenbelag verschieben#moving a piece of street surface#
RDB -
RDB00010209
T. Linder, Arbeiter an der "Chrampf-Olympiade" 1969
Ein Stück Strassenbelag verschieben#moving a piece of street surface#
RDB -
RDB00191503
Reparatur der Kantonsstrasse in Engelberg, 2005
Der Obwaldner Kantonsbaumeister Jörg Stauber (52) praesentiert die Bauplaene mit den neuen Stahlstuetzen#Cantonal master building Joerg Stauber with building plans of the new steel piles- RDB BY DUKAS
RDB -
RDB00044633
Reparatur der Kantonsstrasse in Engelberg, 2005
Polier Bruno Enz, rechts, und Bohrmaschinist Antonio Dantas hängen in einem Bohrschlitten in der Felswand#Foreman Bruno Enz, on the right, and drill machinist Antonio Dantas hang at the rock face
RDB -
RDB00010995
rdb00010995
--- Freiwillige nach ihrer Ankunft in Lauterbrunnen, 1959#Volunteers on arrival in Lauterbrunnen, 1959
RDB -
RDB00036682
Felsenaubrücke im Bau 1973
--- Felsenaubrücke im Bau 1973#Felsenau bridge unfinished 1973
RDB -
RDB00116732
Bau von neuen Tramgeleisen am Bürkliplatz 1999
--- Bau von neuen Tramgeleisen am Bürkliplatz 1999#Construction of new tram tracks at the Buerkliplatz 1999
RDB -
DUKAS_91151332_BUC
Reisebüro in Cork 2004
--- Reisebüro in Cork 2004#Travel Shop in Cork 2004
DUKAS/Thomas Buchwalder -
RDB00234925
Strassenwalze auf frisch geteerter Strasse
--- Strassenwalze auf frisch geteerter Strasse#Bulldozer- RDB BY DUKAS
RDB -
RDB00217001
NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004
--- NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004 #Pile of rubble and road bypassing closed Mitholz tunnel, 2004- RDB BY DUKAS
RDB -
RDB00216568
NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004
--- NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004 #Pile of rubble and road bypassing closed Mitholz tunnel, 2004- RDB BY DUKAS
RDB -
RDB00187460
Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004
--- Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004 #Road bypassing closed Mitholz tunnel, 2004- RDB BY DUKAS
RDB -
RDB00166580
Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004
--- Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004 # Men standing on pile of rubble of NEAT building site at Kandersteg, 2004- RDB BY DUKAS
RDB -
RDB00164028
Sicht vom Höhenweg Nordrampe auf die NEAT-Baustelle und Mitholz-Tunnel, 2004
--- Sicht vom Höhenweg Nordrampe auf die NEAT-Baustelle und Mitholz-Tunnel, 2004#View on building site of the NEAT and on Mitholz tunnel, 2004- RDB BY DUKAS
RDB -
RDB00163773
Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004
--- Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004 #Men standing on pile of rubble of NEAT building site at Kandersteg, 2004- RDB BY DUKAS
RDB -
RDB00143861
Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004
--- Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004 #Road bypassing closed Mitholz tunnel, 2004- RDB BY DUKAS
RDB
