Your search:
107 result(s) in 0.11 s
-
DUKAS_186412179_NUR
Zelivskeho Subway Station Platform In Prague
Passengers wait on the platform of the Zelivskeho subway station in Prague, Czech Republic, on May 10, 2025. The station serves the local underground public transport system on Line A. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_186412175_NUR
Zelivskeho Subway Station Platform In Prague
Passengers wait on the platform of the Zelivskeho subway station in Prague, Czech Republic, on May 10, 2025. The station serves the local underground public transport system on Line A. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_186211863_NUR
Monsoon And Rainbow In Nepal
Traffic congestion occurs in Gwarko, Lalitpur, following the inaugural event of the first overpass in Lalitpur on June 20, 2025. According to a special weather bulletin issued by the Department of Hydrology and Meteorology (DHM), this expansion comes 23 days after the monsoon first enters Nepal. This year, the monsoon enters from the eastern part of the country on May 29 and initially covers most parts of Koshi Province. By June 12, it expands to parts of Madhesh, Bagmati, and Gandaki provinces, as well as the eastern region of Lumbini Province. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186211852_NUR
Monsoon And Rainbow In Nepal
Traffic congestion occurs in Gwarko, Lalitpur, following the inaugural event of the first overpass in Lalitpur on June 20, 2025. According to a special weather bulletin issued by the Department of Hydrology and Meteorology (DHM), this expansion comes 23 days after the monsoon first enters Nepal. This year, the monsoon enters from the eastern part of the country on May 29 and initially covers most parts of Koshi Province. By June 12, it expands to parts of Madhesh, Bagmati, and Gandaki provinces, as well as the eastern region of Lumbini Province. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186211826_NUR
Monsoon And Rainbow In Nepal
Traffic congestion occurs in Gwarko, Lalitpur, following the inaugural event of the first overpass in Lalitpur on June 20, 2025. According to a special weather bulletin issued by the Department of Hydrology and Meteorology (DHM), this expansion comes 23 days after the monsoon first enters Nepal. This year, the monsoon enters from the eastern part of the country on May 29 and initially covers most parts of Koshi Province. By June 12, it expands to parts of Madhesh, Bagmati, and Gandaki provinces, as well as the eastern region of Lumbini Province. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186211819_NUR
First Overpass Of Nepal Inaugurated
Nepal Prime Minister KP Sharma Oli (Center) unveils the plaque during the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186211817_NUR
First Overpass Of Nepal Inaugurated
Nepal Prime Minister KP Sharma Oli addresses the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186211815_NUR
First Overpass Of Nepal Inaugurated
Nepal Prime Minister KP Sharma Oli (center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From the Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186211812_NUR
First Overpass Of Nepal Inaugurated
Nepal Prime Minister KP Sharma Oli (center holding the bouquet) arrives to attend the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186211810_NUR
First Overpass Of Nepal Inaugurated
Nepal Prime Minister KP Sharma Oli (second right from center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186198646_NUR
Drone View Of Gwarko Overpass Highway In Lalitpur, Nepal.
The aerial view shows the Gwarko Overpass highway in Lalitpur, Nepal, on June 20, 2025. The Gwarko Overpass is a newly built four-lane elevated highway in Lalitpur, designed to ease traffic congestion at one of Kathmandu's busiest junctions. (Photo by Ambir Tolang/NurPhoto) -
DUKAS_186198645_NUR
Drone View Of Gwarko Overpass Highway In Lalitpur, Nepal.
The aerial view shows the Gwarko Overpass highway in Lalitpur, Nepal, on June 20, 2025. The Gwarko Overpass is a newly built four-lane elevated highway in Lalitpur, designed to ease traffic congestion at one of Kathmandu's busiest junctions. (Photo by Ambir Tolang/NurPhoto) -
DUKAS_186198644_NUR
Drone View Of Gwarko Overpass Highway In Lalitpur, Nepal.
The aerial view shows the Gwarko Overpass highway in Lalitpur, Nepal, on June 20, 2025. The Gwarko Overpass is a newly built four-lane elevated highway in Lalitpur, designed to ease traffic congestion at one of Kathmandu's busiest junctions. (Photo by Ambir Tolang/NurPhoto) -
DUKAS_186198642_NUR
Drone View Of Gwarko Overpass Highway In Lalitpur, Nepal.
The aerial view shows the Gwarko Overpass highway in Lalitpur, Nepal, on June 20, 2025. The Gwarko Overpass is a newly built four-lane elevated highway in Lalitpur, designed to ease traffic congestion at one of Kathmandu's busiest junctions. (Photo by Ambir Tolang/NurPhoto) -
DUKAS_186169532_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
Vehicles move under the newly built and Nepal's only underpass in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169529_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169439_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169438_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169437_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A man jogs over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169436_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A girl cycles over the newly built overpass infrastructure in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169435_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A Nepali woman poses for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169434_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A boy cycles over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169433_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169432_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
Cycles are parked over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169431_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169430_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169429_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169428_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169427_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169425_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169423_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A boy skates over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169419_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169418_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_184998860_NUR
Protesters On A Highway Overpass Threaten President Donald Trump With Words 8647 On Route 4 By Bergen Town Center
Protesters hang up signs that include a message threatening President Donald J. Trump on the Route 4 Highway Overpass by the Bergen Town Center in Paramus, New Jersey, United States, on May 19, 2025. Protesters hold up messages that read ''8647'', ''Make Nazis Afraid Again'', ''The Boss Rules, 47 Drools'' and affix an American flag and pride flag to the overpass. (Photo by Kyle Mazza/NurPhoto) -
DUKAS_184998859_NUR
Protesters On A Highway Overpass Threaten President Donald Trump With Words 8647 On Route 4 By Bergen Town Center
Protesters hang up signs that include a message threatening President Donald J. Trump on the Route 4 Highway Overpass by the Bergen Town Center in Paramus, New Jersey, United States, on May 19, 2025. Protesters hold up messages that read ''8647'', ''Make Nazis Afraid Again'', ''The Boss Rules, 47 Drools'' and affix an American flag and pride flag to the overpass. (Photo by Kyle Mazza/NurPhoto) -
DUKAS_184998858_NUR
Protesters On A Highway Overpass Threaten President Donald Trump With Words 8647 On Route 4 By Bergen Town Center
Protesters hang up signs that include a message threatening President Donald J. Trump on the Route 4 Highway Overpass by the Bergen Town Center in Paramus, New Jersey, United States, on May 19, 2025. Protesters hold up messages that read ''8647'', ''Make Nazis Afraid Again'', ''The Boss Rules, 47 Drools'' and affix an American flag and pride flag to the overpass. (Photo by Kyle Mazza/NurPhoto) -
DUKAS_184998857_NUR
Protesters On A Highway Overpass Threaten President Donald Trump With Words 8647 On Route 4 By Bergen Town Center
Protesters hang up signs that include a message threatening President Donald J. Trump on the Route 4 Highway Overpass by the Bergen Town Center in Paramus, New Jersey, United States, on May 19, 2025. Protesters hold up messages that read ''8647'', ''Make Nazis Afraid Again'', ''The Boss Rules, 47 Drools'' and affix an American flag and pride flag to the overpass. (Photo by Kyle Mazza/NurPhoto) -
DUKAS_184998856_NUR
Protesters On A Highway Overpass Threaten President Donald Trump With Words 8647 On Route 4 By Bergen Town Center
Protesters hang up signs that include a message threatening President Donald J. Trump on the Route 4 Highway Overpass by the Bergen Town Center in Paramus, New Jersey, United States, on May 19, 2025. Protesters hold up messages that read ''8647'', ''Make Nazis Afraid Again'', ''The Boss Rules, 47 Drools'' and affix an American flag and pride flag to the overpass. (Photo by Kyle Mazza/NurPhoto) -
DUKAS_184690482_NUR
Prague Central Station
Passengers with luggage walk and wait on a covered platform between regional and long-distance trains at Prague Central Station in Prague, Czech Republic, on May 9, 2025. The platform features benches, signage, and direct access to various train services operated by Czech Railways and regional transit providers. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_184546175_NUR
Railway Infrastructure In The City Of Prague
A view of the railway track junction and surrounding infrastructure at Masaryk Railway Station in Prague, Czech Republic, on May 10, 2025, shows multiple rail lines, maintenance buildings, elevated roads, and a construction site for future development near the terminal platforms. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_184546172_NUR
Railway Infrastructure In The City Of Prague
A yellow RegioJet long-distance passenger train travels across a railway viaduct in Prague, Czech Republic, on May 9, 2025. The elevated tracks run parallel to multi-lane roads and pass near historic and modern buildings, showcasing Prague's complex urban transport infrastructure. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_184546169_NUR
Railway Infrastructure In The City Of Prague
A Czech Railways (Ceske Drahy) passenger train with blue carriages travels across an elevated railway viaduct in Prague, Czech Republic, on May 10, 2025. Historic architecture, modern office buildings, and the green hills of a park form the backdrop of Prague's rail infrastructure. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_184546166_NUR
Railway Infrastructure In The City Of Prague
A passenger train crosses an elevated railway viaduct near Masaryk Railway Station in Prague, Czech Republic, on May 10, 2025. The image shows a mix of modern and historical railway infrastructure, including multiple tracks, maintenance buildings, and terminal platforms. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_184546122_NUR
Railway Infrastructure In The City Of Prague
A red and blue international passenger train travels on an elevated railway viaduct in Prague, Czech Republic, on May 10, 2025. The image shows the urban railway infrastructure with the city skyline visible in the background. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_184546120_NUR
Railway Infrastructure In The City Of Prague
A RegioJet long-distance passenger train runs across an elevated railway viaduct toward Masaryk Railway Station in Prague, Czech Republic, on May 10, 2025. The historic station, one of the oldest in Prague, is surrounded by extensive railway infrastructure and urban development. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_184126546_NUR
Crowd Of People At A Deutsche Bahn Platform Staircase
A dense crowd of passengers ascends the stairs to platform 4 at the Deutsche Bahn (DB) train station in Plattling, Deggendorf, Lower Bavaria, Germany, on April 26, 2025. The scene reflects heavy foot traffic during a peak travel period at this regional transit hub. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_183624121_NUR
S-Bahn In Munich To Herrsching
A red S-Bahn train, specifically an S8 heading towards Herrsching, travels along an elevated concrete track in Munich, Germany, on May 22, 2021. The train, operated by Deutsche Bahn (DB), passes by a modern building with numerous windows and a pedestrian walkway featuring a red railing; graffiti is visible on the supporting concrete structures below the track. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_183540361_NUR
Youth Sitting On Hackerbrücke Above S-Bahn Train
Two young teenagers sit on the railing of the Hackerbrucke bridge above an S-Bahn train in motion in Munich, Germany, on April 13, 2025. The Hackerbrucke is a well-known steel bridge adjacent to the Hackerbrucke S-Bahn station, often frequented by locals and visitors for its views over the tracks and trains. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_183540359_NUR
Youth Sitting On Hackerbrücke Above S-Bahn Train
Two young teenagers sit on the railing of the Hackerbrucke bridge above an S-Bahn train in motion in Munich, Germany, on April 13, 2025. The Hackerbrucke is a well-known steel bridge adjacent to the Hackerbrucke S-Bahn station, often frequented by locals and visitors for its views over the tracks and trains. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_173889476_POL
Russia bombs Kyiv
KYIV, UKRAINE - AUGUST 26, 2024 - People stay under an overpass during the massive Russian drone and missile attack on Ukraine, Kyiv, capital of Ukraine. (Ukrinform/Polaris) (FOTO:DUKAS/POLARIS)
Ukrinform